Thursday, December 4, 2008

Word of the day...Infrastructure.

(I've stopped counting how many posts this thread contains. But if you like to track progress chronologically, you might want to jump back to the beginning.)

The structure is complete. Now comes the INFRA-structure...all the pipes and wires and metal and wood that make the place work. This week studio designer David Rochester arrived from Nashville to begin turning all those four-walled rooms into proper studios and control rooms. Here's a shot of the acoustics framing for the front wall of Control Room A.


Once the details are nailed down for this room and the framing infrastructure is in place, it will be precisely duplicated in Control Rooms B and C. Then the acoustic materials will start going in. LOTS of rock wool and Owens-Corning 703 compressed fiberglass.

In this shot, you see the HVAC and sprinkler pipe penetrations for Control Room A.


And here's how they look in Studio 1.


Meanwhile, drywall finishing is progressing in the common areas.



So far, right on schedule. Very cool.

Until next time...

Monday, November 24, 2008

Stone walls completed.

If you're following my musings with any degree of regularity, you may be relieved that all talk of Hemholtz Resonators ends with this post. They're finished!

Here's a shot that gives you an idea of the process.


Stone by stone, the wall sections have risen to their finished height of over thirteen feet. This section along the back wall is eight feet wide.


These two sections on opposing side walls are each six feet wide.




This shot, taken from a side angle, shows the stone in more relief. You can see how the wall will reflect sound in a random fashion. "Random diffusion" is the acoustical term, I believe.


Electrical and plumbing inspections having passed, drywall installation begins tomorrow in the offices and common areas. The place feels more like home every day.

Until next time...

Friday, November 21, 2008

Details, details, details.

Jerry, our intrepid construction superintendent, told me a couple of weeks ago that construction would reach a point when all the "big" stuff is finished, after which we wouldn't notice nearly as much drastic change from day to day. I'm not sure if we're there, yet. But even if we were, I still appreciate and enjoy seeing all that little stuff happen.

If you saw earlier photos of the common area framing, here's another shot of the front offices with electrical wiring in progress.


Jack, the honcho electrician, makes sure it all gets done right.


The first layer of drywall has been hung on the ceilings of the studios and control rooms. Here's a shot of an upper corner of Control Room C.


Another application of green glue will go between this and the next layer of ceiling drywall, then acoustical sealant will make things airtight around the perimeter.

The curved stone walls/Hemholtz Resonators have been prepped for the masons. First a layer of construction felt, to keep moisture from the mortar from penetrating into the wood. Then a layer of wire mesh for the mortar to adhere to. The photo turned out blurry, but I think it's good enough to give you the idea. (Almost all the photos shown in the blog are taken with my iPhone, which doesn't have a flash.)


The stone will start going up within the next day or two. This will be the first "finished" surface of a studio or control room, so I'm pretty excited about seeing it happen. You'll see the photos when it does.

Until next time...

Wednesday, November 19, 2008

A quick update...

I thought you might like to see the completed forms for the curved stone walls/Hemholtz Resonators. They're six feet wide on the side walls, and eight feet wide on the back wall. And to give you a complete sense of scale, they're thirteen feet high, stopping 6 inches short of where the finished ceiling will be. Later this week, they'll be covered with beautiful Kentucky grey stacked stone. I'll post pix as soon as they're complete.




Until next time...

Monday, November 17, 2008

A Hemholtz WHAT?!


A Hemholtz Resonator. It's one of the neat new things I've learned during the process of building our new studios.

The original idea was to build three curved, stacked stone walls in Studio 1. Not only were these designed to be a stunning feature visually; but between the curved shape of the walls and the random surface of the stone, they would provide for random diffusion of mid and high frequencies. But studio designer David Rochester is taking things one step further. By filling the cavities with fiberglass insulation, then cutting small holes at the top, each of the three structures will also serve as a sort of giant Hemholtz Resonator.


Now I have to admit, I'd heard about Hemholtz Resonators but was never exactly sure how they work. So I did a Google search and started reading. I'd share what I learned, but I think the geeky detail meter would zip right off the scale. The short version is this: Hermann von Helmholtz made a discovery in the 1850's about the phenomenon of air resonance in a cavity. Think of the effect of blowing across the top of a bottle or the hollow space inside a guitar or violin. What happens to sound as it enters and exits a cavity through small openings involves resonance at specific frequencies. If you fill the cavity with damping material (such as insulation), a much broader range of frequencies is affected. So functionally, a Hemholtz Resonator helps tame the buildup of undesirable bass frequencies.


The electrical junction box in the center is for a handsome contemporary sconce which will throw light both up and down the stone.

The end result will be three structures which:

1. Are a beautiful architectural feature.
2. Diffuse mid and high frequencies for smooth reverberation.
3. Tame low frequencies to help give the studio an even frequency response.


Proving once again - when you want it done right...hire professionals.

Meanwhile, here's a giant stack of R-30 insulation ready to go into studio and control room ceilings before drywall goes up. You'll see the photos here soon.


Until next time...

Wednesday, November 12, 2008

The World Is Watching.

I have to admit, I'm not really into blogging. When we began the process of building a new recording facility (after 18 years at our current location) I decided to start this blog at the urging of my wife Becky. (A link to her blog is to the right. I think it's wonderful. But of course, I'm biased.)

I don't have anything against blogging, mind you. I just assumed that few would be interested in what I affectionately call the "geeky details" of our new facility. It was mostly a way for me to document the process and ramble about things I learn and stuff I find interesting. I emailed the link to a few friends and colleagues. Other than that, I only mentioned it on the Concentrix website and on one or two internet discussion groups frequented by professional composers like myself. Not many responded in those forums, so I took my assumption to be correct.

Then Becky told me I should add a gadget to my blog called "ClustrMaps", which lets you track the geographical location of blog visitors. Now, ordinarily I'm the one digging into the technological gobbledygook and Becky is more the Luddite. So, it was fun having her show me how to imbed the app on my blog page. (The link is down and to the right.)

I thought it would be neat if I discovered one or two red dots on the map. So imagine my surprise when I discovered that over 150 people have dropped in from all over the globe! Japan, the Phillipines, Indonesia, Australia, Chile, Canada, India, Isreal, and from numerous points around Europe and Scandanavia.

If you'll forgive my naive enthusiasm - this is really cool! So to those of you across the globe taking a moment to check in on the construction of our humble studio...

Thank you. And welcome!
धन्यवाद. और आपका स्वागत है.
Tak. Og velkommen.
Bedankt. En welkom.
Salamat. At welcome.
Merci. Et bienvenue.
Danke. Und willkommen.
תודה. וברוכים הבאים.
Terima kasih. Dan selamat datang.
Grazie. E benvenuto.
ありがとうございました。と歓迎する。
Obrigado. E bem vindos.
Gracias. Y la recepción.
Tack. Och välkomna.
Dziękuję. I mile widziane.
Děkujeme vám. A vítaná.
Kiitos. Ja tervetuloa.

I THINK that covers all the red dots on the map. It's difficult to pinpoint the exact location of some of them. If your language isn't represented, leave a comment and I'll promptly rectify the situation.

Next time, more photos and geeky details.

Tuesday, November 11, 2008

Remaining rooms take shape.

(We started the process of building our new studio back in May. If you're here for the first time you might like to start from the beginning. Links to earlier posts are to the right.)

We've been so focused on the integrity of the studios and control rooms, let's not forget that a functioning studio still needs offices, a place to eat (always a critical issue with musicians, engineers, producers and directors), and essential spaces like, oh...restrooms. With most of the big work complete, framing began this week on all the "common areas".

As you enter the lobby, there's a window looking into to the administrative office on your right.


Look straight ahead, and you see down the long hallway toward Studios 1 and 2, Control Rooms A and B, as well as the breakroom and restrooms.


Look just slightly to the right and there's an angled wall which will hold a beautiful glass shelf display case designed by Architect Brian Gaddis. (I'll share photos when it's complete. Brian's design is REALLY cool.)


Down this short hallway is the entrance to Studio 1. Restrooms are on the right.


And if you turn right from the lobby, you see Studio 3 at the end of the hall. Offices are to the right, and Control Room C to the left.


While the framing crew was at it, work was also underway applying additional sound isolation layers to the walls inside studios and control rooms; completion of HVAC ductwork overhead; and the running of electrical conduit.

It was pretty exciting being able to walk through the actual layout of the entire facility. I had to drag myself away. But another deadline loomed and there was music to be written. During the short drive back to our current studio, all I could think about is how great it's going to be working every day in those fabulous new rooms!

Until next time...